/
Activity Structure Synchronization

Activity Structure Synchronization

Similar steps can be performed using the Activity structures in Syndeia Simulink Examples model as in the previous section with Block structures:

  • Generate Simulink models from Model Generation :: Basic Models :: Activity :: Overall Mission activity and then compare
  • Make changes to either Simulink model (Overall_Mission.slx) or SysML activity (Overall Mission) by adding and deleting elements, as was done with SysML block structures above
  • Compare and sync either SysML -> Target or Target → SysML to resolve the changes

Related content

Activity Structure Synchronization
Activity Structure Synchronization
More like this
Activity Structure Synchronization.
Activity Structure Synchronization.
More like this
Activity Structure Synchronization.
Activity Structure Synchronization.
More like this
Generating Simulink model from SysML activity.
Generating Simulink model from SysML activity.
More like this
Generating Simulink model from SysML activity.
Generating Simulink model from SysML activity.
More like this
Generating Simulink model from SysML activity
Generating Simulink model from SysML activity
More like this

Copyright 2018 Intercax.