Activity Structure Synchronization
Similar steps can be performed using the Activity structures in Syndeia Simulink Examples model as in the previous section with Block structures:
- Generate Simulink models from Model Generation :: Basic Models :: Activity :: Overall Mission activity and then compare
- Make changes to either Simulink model (Overall_Mission.slx) or SysML activity (Overall Mission) by adding and deleting elements, as was done with SysML block structures above
- Compare and sync either SysML -> Target or Target → SysML to resolve the changes