Activity Structure Synchronization

Similar steps can be performed using the Activity structures in Syndeia Simulink Examples model as in the previous section with Block structures:

  • Generate Simulink models from Model Generation :: Basic Models :: Activity :: Overall Mission activity and then compare
  • Make changes to either Simulink model (Overall_Mission.slx) or SysML activity (Overall Mission) by adding and deleting elements, as was done with SysML block structures above
  • Compare and sync either SysML -> Target or Target → SysML to resolve the changes